Skip to main content

110 references correspond to your search

Railway Electrification Project Corridor 2 (Bukhara-Miskin-Urgench-Khiva) (
2023
-
2027
)

Energy infrastructure Uzbekistan
Asian Development Bank

The project aims to electrify the existing railway line between Bukhara, Miskin, Urgench, and Khiva, enabling high-speed passenger trains to operate and significantly reducing travel time from 8 hours (on road transport) to 3. The objective is to connect key tourist destinations like Tashkent, Samarkand, Bukhara, and Khiva by high-speed rail, boosting Uzbekistan's appeal as a tourism destination. Outputs include: 1) upgrading railway infrastructure along the line, and 2) developing the tourism corridor from Bukhara to Khiva.

Lire plus Réduire

Feasibility Study for 100–200 MW Wind Farm in West Java (
2022
-
2026
)

Energy infrastructure Indonesia
French Development Agency

As part of the diversification of Indonesia's energy mix, PLN wishes to develop a wind farm with an installed capacity of around 200 MW in the Banten region on the island of Java. SOFRECO is carrying out the feasibility study for this wind farm under AFD financing and in consortium with the developer 3E, until the recruitment of the turnkey contractor. This study begins with the installation of measurement masts, then includes the selection of the most suitable power generation devices for the site, the design of the wind farm and its connection, as well as all the technical and financial studies necessary for the construction (topography, geotechnics, transport and stability of the network).

Lire plus Réduire

Feasibility Study for the Hybridisation of the Power Plant in the City of Diffa (
2022
-
2023
)

Energy infrastructure Niger
African Development Bank

Conduct of a technical, economic, financial and environmental feasibility study for the hybridisation of the NIGELEC thermal power plant in Diffa, Niger, with photovoltaic solar energy, as well as its integration into the national grid.

Feasibility study for the second electricity interconnection project for Côte d'Ivoire/Burkina Faso (
2022
-
2023
)

Energy infrastructure Burkina Faso Côte d'Ivoire
Millennium Challenge Corporation

Conduct of a feasibility study on:
- the construction of a second high-voltage connection from Ferkessédougou or a neighbouring location on the Ivorian network (Kong) to Bobo Dioulasso (204 km) and from Bobo Dioulasso to Ouagadougou (336 km);
- the extension and/or construction of substations;
- electrification of communities and villages along the line and around the substations;
- the installation of compensation and synchronisation equipment and flow control, if required;
- CI-ÉNERGIES (Côte d'Ivoire) and SONABEL (Burkina Faso) network reinforcements, if required.

Lire plus Réduire

Feasibility study for the second electricity interconnection project for Côte d'Ivoire/Burkina Faso (
2022
-
2023
)

Energy infrastructure Burkina Faso Côte d'Ivoire
Millennium Challenge Corporation

Conduct of a feasibility study on:
- the construction of a second high-voltage connection from Ferkessédougou or a neighbouring location on the Ivorian network (Kong) to Bobo Dioulasso (204 km) and from Bobo Dioulasso to Ouagadougou (336 km);
- the extension and/or construction of substations;
- electrification of communities and villages along the line and around the substations;
- the installation of compensation and synchronisation equipment and flow control, if required;
- CI-ÉNERGIES (Côte d'Ivoire) and SONABEL (Burkina Faso) network reinforcements, if required.

Lire plus Réduire

Technical due diligence of a 60MW wind farm (
2022
-
2022
)

Energy infrastructure Djibouti
Others

The Ghoubet project is a 60MW under-construction wind farm in Djibouti. It is developed by an Independent Power Producer (IPP), Red Sea Power, and works are conducted by Siemens-Gamesa.
A company, which is considering acquiring a stake in the project, has tasked a group of consulting firms to conduct a complete due diligence of the project. SOFRECO was responsible for the on-site technical due diligence. The purpose of the visit was to assess the physical state of construction, to compare this with the project's progress reports and to produce a report highlighting areas of concern or red flags.

Lire plus Réduire

Control, supervision and monitoring of services for the design, supply and construction of rural electrification works (PROSER) (
2022
-
2024
)

Energy infrastructure Côte d'Ivoire
African Development Bank

The objective of the services is to ensure the proper implementation of the works to be constructed as part of the PROSER project for 805 locations spread across 17 regions of the country. The works planned for PROSER concern the construction of 6,460 km of 33kV overhead lines, the installation of 1,394 substations, and the construction of 3,419 km of LV lines, as well as 113,838 LV connections and the installation of 94,023 public lighting units.

Lire plus Réduire

Owner’s Engineer for Design, Procurement and Construction Supervision of the transmission network (
2022
-
2027
)

Energy infrastructure Dominica
World Bank

The objective of the assignment is to provide technical and management support to the Dominica Geothermal Development Company Ltd. (DGDC) to ensure the successful delivery of the construction of the new transmission network at 69 kV and 33 kV connecting the planned 15 MW geothermal power plant to the existing grid. The success of the Project will be assessed by the delivery of this new infrastructure on schedule, within budget and according to technical, environmental and social standards.
The Owner’s Engineer is expected to: (i) perform preliminary surveys and the corresponding scoping, cost estimate and engineering design work for transmission lines and substations; prepare the procurement plan, bidding documents for each procurement package, including technical specifications; (ii) support DGDC in the bidding process (iii) support DGDC for contract management and carry out construction supervision, and (iv) support DGDC during the guarantee period.

Lire plus Réduire

Consulting Engineer for the ACCES project (detailed design, detailed ESIA, preparation and implementation of RAP, construction tender documents and the construction supervision option) (
2022
-
2026
)

Energy infrastructure Senegal
Millennium Challenge Corporation

Conduct of design studies, environmental and social assessments and supervision of the construction and rehabilitation of the MV and LV networks of the ACCES project.

Supervision of the construction of the solar power plant at the North Gaza Water Treatment Plant (
2022
-
2025
)

Energy infrastructure Palestinian Territories
French Development Agency

The North Gaza Sewage Treatment Plant's Solar Power Station project aimed to design, supply and install a 7.53 MWp solar photovoltaic power station. The Contractor was hired to design and build a photovoltaic power station and the associated energy management systems (EMS), divided into 4 sub-groups throughout the Sewage treatment plant site.
As part of this project, SOFRECO carried out the project management assistance, from the design studies to the operational acceptance and commissioning. The project was interrupted by the events in Gaza, starting 7 October 2023.

Lire plus Réduire

Non-exaustive list. Please contact us for more information.