Conduct of studies for the construction of a Dry Port in N'Gueli ( 2021 - 2023 )
Within the framework of deepening integration by reducing the duration and cost of goods transit following the decongestion of the Douala Autonomous Port in favour of the relocation of port transit operations, the objective is to improve customs clearance conditions between Cameroon and Chad, reduce transport costs, improve the fluidity of traffic and reduce customs clearance time as well as physical and non-physical barriers along the corridor.
The N'gueli dry port will be a multifunctional customs clearance platform dedicated to the relocation of port operations, including, among others: (i) buildings (ii) a weighing station (iii) an autonomous water supply system; (iv) an autonomous electricity supply system (v) an autonomous wastewater treatment system (vi) an autonomous system for the recycling and recovery of waste (v) roads and various networks, and (vi) and fences.