This project, jointly financed by the AFD and the KfW, aims at supporting the Uganda Electricity Transmission Company Ltd. (the Client) for the implementation of the Masaka-Mbarara 400 kV transmission line and associated substations.
It consists of two consecutive phases:
- Phase 1 involving the review, updating and additional study of the design documents, the preparation of the tender documents and support to the Client during the tendering process to select a contractor for the works (10 months).
- Phase 2 involving project management and construction supervision (18 months).