This project aims to improve supply reliability by conditioning the transmission and distribution system, rehabilitating the protection relay, and strengthening and increasing the power supply capacity so as to provide electricity to non-electrified or newly developing areas, thereby contributing to economic and social development in the Santo Antão, S. Vicente, Sal, Maio, Santiago and Fogo islands of Cape Verde.
The work carried out by the Consultant involves the supervision of the works, including the installation of underground lines, overhead lines, transformers, meters and a SCADA system. It includes the control and surveillance of the works, and monitoring the implementation of environmental and social measures. Training support is also provided to the Project Owner.