Feasibility study and environmental and social impact assessments of the FORSUN project: 20 MW photovoltaic solar power plant and strengthening of the distribution network in Benin ( 2020 - 2021 )
The aim of this Technical Assistance mission is to strengthen the electricity sector in Benin as well as to foster the development of renewable energies via three main components. The first consists of the production of a preliminary design, detailed preliminary design, and detailed Environmental and Social Impact Assessment (ESIA), as well as the drafting of bidding documents for the extension, densification and strengthening of the LV and MV grid in urban and rural areas. The second aims to increase the share of solar power in the electricity through the production of a preliminary design, detailed preliminary design and ESIA, as well as drafting of bidding documents of the DEFISSOL solar power plant extension (+20 MW). The third and final component consists of the drafting of two generic documents intended for use on all the electrification projects of the Beninese Electricity Company (SBEE): an Environmental and Social Management Framework (ESMF) as well as a Resettlement Plan Framework.