Gara Djebilet iron ore deposit – Review of the JORC resource estimate ( 2018 - 2018 )
This contract dealt with the review of the resource estimate of the Gara Djebilet iron ore deposit. The resource estimate was prepared for FERAAL by the company DMT (the project’s PMC).