Master Plan for the El Maarouf Hospital in Moroni ( 2022 - 2022 )
Drafting of the master plan for the new El Maarouf Hospital under construction (for a capacity of 300 beds), to be based on the government's National Health Policy (2015-2024), relevant international practices and standards and the economic and political contexts, as well as the health map, including the current situation in terms of functionality, capacity and the technical platform of the health system's structures at all levels and services, geographical distribution, infrastructure, technical resources, human resources, utilisation, and the referral system. The master plan includes an implementation plan detailing the requirements, services, governance and a business plan that contributes to the successful implementation and operationalisation of the hospital.