Phosphate-3 Project Complimentary Fieldwork ( 2018 - 2019 )
Design, supervision and studies for the complementary works of the PHOS-3 project:
- One Trial Mining Cut (TMC) for the characterisation of the UMW4-5 deposit, including drill and blast, digging tests, equipment performance, bulk sampling (app. 60 t of ore), transportation for crushing and milling tests, in-situ bulk density, moisture content and Point Load Test (PLT - optional) as well as geological logging and sampling.
- Reverse Circulation (RC) drilling as part of grade control.