Project management for the construction of the power line connecting the 30-MWp solar photovoltaic power plant in Ouagadougou ( 2021 - 2022 )
The overall objective of the project financed by GreenYellow is to build and commission a 30-MWp solar power plant, located approximately 30 km north-east of Ouagadougou, together with its 33-kV evacuation line, all connected to one of the existing 33/90-kV delivery substations in Ziniaré owned by Sonabel.
SOFRECO is responsible for supervising work on the 33-kV connection line and for commissioning the solar power plant and line.