The North Gaza Sewage Treatment Solar Power plant project aims to design, supply and install a 7.53 MWp solar photovoltaic power station. The Contractor is to design a photovoltaic power station and the associated energy management systems (EMS), divided into 4 sub-groups throughout the Sewage treatment plant site.
As part of this project, SOFRECO is carrying out the project management assistance, from the design studies to the operational acceptance and commissioning, i.e., 22 months.