The objective of the Power Transmission and Distribution Networks Reinforcement Project (PRETD) is to develop and reinforce the power transmission and distribution facilities defined hereafter:
- creation of the Bingerville 220/20kV substation and restructuring of the Bingerville MV network;
- doubling of the Soubré-San Pedro 225 kV line and related works at the 225 kV substations of Soubré and San Pedro;
- construction of the Duékoué-Zagné 225 kV line, of the 225/33 kV substations of Duékoué and Zagné, and of the 33 kV Zagné-Taï line, and restructuring of the MV networks of Duékoué, Zagné and Taï;
- rural electrification of 252 localities, contributing to a rise in coverage in the country's west zone (Montagnes District) of 26.45%, i.e. a national increase of 3 points.