Projects and references
1176 references correspond to your search
Baseline study for the operationalization of the Niger Basin Observatory (NBO) ( 2009 - 2010 )
The objective of the study is to go deeper into and specify the conditions necessary to make the NBO operational in terms of development planning and the creation of monitoring & evaluation (ME) and environmental monitoring tools. The specific objectives of the study focus on:
1. The development of ME and environmental monitoring tools for the Niger basin;
2. The preparation of a development plan for the NBO.
Baseline study for the operationalization of the Niger Basin Observatory (NBO) ( 2009 - 2010 )
The objective of the study is to go deeper into and specify the conditions necessary to make the NBO operational in terms of development planning and the creation of monitoring & evaluation (ME) and environmental monitoring tools. The specific objectives of the study focus on:
1. The development of ME and environmental monitoring tools for the Niger basin;
2. The preparation of a development plan for the NBO.
Baseline study for the operationalization of the Niger Basin Observatory (NBO) ( 2009 - 2010 )
The objective of the study is to go deeper into and specify the conditions necessary to make the NBO operational in terms of development planning and the creation of monitoring & evaluation (ME) and environmental monitoring tools. The specific objectives of the study focus on:
1. The development of ME and environmental monitoring tools for the Niger basin;
2. The preparation of a development plan for the NBO.
Technical assistance for the environmental and social management of the Emergency Urban and Social Rehabilitation Project (PURUS) ( 2009 - 2011 )
The technical assistance for the environmental and social management of the PURUS relates to three components: the “water” component, with the set-up of mitigation measures and the corresponding control structures, the “urban roads” component, involving supervision of the environmental and social management of the urban road rehabilitation, and finally, a cross-cutting component covering information, consultation of civil society, awareness raising and capacity building. The final objective is to enable the different institutions concerned by the project to gain the skills and operational procedures necessary for good environmental and social management.
Establishment of mining cadastre, inspectorate, audit and licensing functions within the Ministry of Mines ( 2008 - 2011 )
The Afghanistan Ministry of Mines is being restructured to perform essential advisory, regulatory, facilitating and promotional functions related to the mining and hydrocarbon sectors.
Our consortium is working on:
- establishment and operational support to the Cadastre Department which will be responsible for the issuing and management of mining and hydrocarbon licences and contracts;
- establishment and capacity building of the Inspectorate Department with responsibility for monitoring and maintaining technical, safety and elements of the financial standards of mining operations.
Study for the updating of the National Water Plan ( 2008 - 2011 )
Study for the updating of the National Water Plan.
Strengthening of Environmental Management ( 2006 - 2007 )
The project’s aim was to provide technical assistance to the MEPP in the preparation of a National Strategy for Environmental Approximation (NSEA) providing a comprehensive route-map of prioritized actions for achieving full compliance with all 10 sectors of the EU environmental acquis. Covering all aspects of approximation and providing assistance in planning a coherent investment programme, it was to contribute to creating the conditions for sustainable development in the fYR of Macedonia.
Development of a master plan for silting control in the Niger basin ( 2006 - 2007 )
The programme to control silting in the Niger river basin aims to curb the degradation process underway and to ensure the sustainable development of the entire zone.
The study concerns the elaboration of:
- A master plan to prevent silting in the Niger basin;
- An action plan;
- A short-, medium- and long-term investment programme.
Development of a master plan for silting control in the Niger basin ( 2006 - 2007 )
The programme to control silting in the Niger river basin aims to curb the degradation process underway and to ensure the sustainable development of the entire zone.
The study concerns the elaboration of:
- A master plan to prevent silting in the Niger basin;
- An action plan;
- A short-, medium- and long-term investment programme.
Development of a master plan for silting control in the Niger basin ( 2006 - 2007 )
The programme to control silting in the Niger river basin aims to curb the degradation process underway and to ensure the sustainable development of the entire zone.
The study concerns the elaboration of:
- A master plan to prevent silting in the Niger basin;
- An action plan;
- A short-, medium- and long-term investment programme.
Non-exaustive list. Please contact us for more information.