Projects and references
1175 references correspond to your search
Support to the implementation of a consumer protection law and regime ( 2006 - 2007 )
The aim of the project was to assist the Egyptian authorities in building the knowledge and capacity to set up an efficient consumer protection regime and to ensure the efficient implementation of the consumer protection law.
Support to customs administration reform ( 2006 - 2007 )
Global objective: Support the Georgian administration in drafting the customs legislation necessary for the implementation of the new customs code.
Specific Objectives:
- Elaboration of secondary legislation in line with EU legislation;
- Harmonisation of customs procedures and working methods in conformity with EU best practices to facilitate trade and data exchange;
- Support in the elaboration of the Terms of Reference, the tendering, evaluation and start-up of the upcoming TACIS Project “TA to secondary customs legislation and Sanitary and Phyto-Sanitary (SPS) controls”.
Technical assistance to strengthen customs capacities ( 2006 - 2006 )
See main contract M 1074
Recruitment of experts in the public finance sector for the Directorate Generals of the National, Customs and Tax domains of the Ministry of Finance ( 2006 - 2008 )
The purpose of the contract is to provide the Ministry of Finance with a pool of short-term expertise (Technical Assistance Team) to cover technical assistance requirements in three fields of taxation: domains and land tenure, customs and tax.
Technical assistance to the Ministry of Finance for the development of internal audit ( 2005 - 2006 )
Assistance in establishing internal audit units within the selected budget users in order to contribute directly to the improvement of the public administration’s capacity to control and plan budget expenditures.
Support to taxation reform ( 2005 - 2007 )
Support to the Ukrainian taxation reform by ensuring optimised conditions for voluntary compliance to the levy of taxes and duties in accordance with Ukrainian legislation. Assistance to the State Tax Service so that it can administrate the country’s taxes in an honest, equitable and competent manner, as well as focusing on its institutional development into a highly qualified authority, able to monitor the entire tax administration process on the basis of comprehensive automation.
Support to central administration level at Pristina - Development and reinforcement of internal audit and internal financial control systems in Kosovo ( 2004 - 2006 )
Technical assistance to reinforce the internal financial control environment throughout the public administration at central and municipal levels and to develop and strengthen internal audit capacities.
Social Insurance Technical Assistance Project (SITAP), Pension Policy Advisor ( 2004 - 2007 )
Provision of advice to the authorities on the current and future policy framework for pensions. It supports development of sustainable pension system, promotes old age income security and equity within and between generations while fitting within the broader social protection systems of BiH.
Strengthening the Provisional Institutions of Self-Government’s (PISG) institutional capacity to participate in the stabilisation and association process. ( 2004 - 2006 )
Support to the PISG for their participation in the stabilisation and association process. Enhance the capacities of the PISG through training in EU affairs and legal drafting, and support the implementation and enforcement of the laws and policies prepared. Reach full compliance of Kosovo draft legislation with EU acquis communautaires in areas including competition, state aid, consumer protection and trade. Expertise in legal approximation and legal drafting.
Developing Standard Operation Procedures (SOPs) for Climate Change Resilient Water Infrastructure ( 2021 - 2021 )
The project, conducted for the Caribbean Community Climate Change Centre, consists in the stakeholders-driven development of regional standard operating procedures (SOPs) to guide and coordinate national water utilities in the development and management of water infrastructure that is resilient to climate change and natural disasters. This involves the training of both water utilities staff and wider communities in SOPs and Integrated Water Resources Management (IWRM) through a train-the-trainer scheme.
Non-exaustive list. Please contact us for more information.