Continuation of supervision of construction work on the ''Electricity Distribution'' project, transferred to the Beninese Electricity Company (SBEE) by MCA-Benin II. (
2023
-
2025
)

Energy infrastructure Benin
Others

The MCA-Benin II Project was completed by the closing date of the Compact on 22 June 2023, with the exception of the contract for the IPP connections of the EIFFAGE/RMT Contractor. The post-completion supervision activity focuses on the removal of reservations and the correction of defects during the Defect Notification Period, in collaboration with the SBEE teams. The current assignment is aimed at supervising the construction work on the connections for the four IPP solar power plants, as well as the removal of reservations for the other contracts, in accordance with standards and contractual requirements.

Lire plus Réduire

Technical assistance for the reinforcement of electricity distribution networks in 9 cities (PEEAE 2 project) (
2022
-
2026
)

Energy infrastructure Senegal
Others

The purpose of the PEEAE2 project is to restructure and extend the electricity distribution networks in 9 towns in Senegal: Saint Louis, Zinguinchor, Kaolack and Fatick, Thiès, Tivouane and Mbour, Touba and Diourbel. The extension and rehabilitation works, estimated at EUR 20 million, concern 214 km of MV lines and 165 km of LV lines, the creation and rehabilitation of 85 MV/LV substations, and the remote control of 74 MV/LV switching stations. The Owner’s engineer mission includes two phases: a review of existing studies/procurement and the supervision of the works/management of the company's contract. The services aim to ensure the smooth running of the works in accordance with the contractual specifications and in compliance with quality standards, deadlines and costs, as well as the efficient commissioning of the project. The engineer acts as the Client's representative.

Lire plus Réduire

Design services, preparation of tender documents and support for procurement and works management for the MCA-Senegal II Project (
2021
-
2026
)

Energy infrastructure Senegal
Millennium Challenge Corporation

The MCA - Senegal II Transmission Network Modernisation and Reinforcement Project (Transmission Project), for the benefit of SENELEC, will result in the construction of 16 km of 225 kV submarine cables, 31 km of 225 kV underground cables and 2 new 225 kV substations, as well as the installation of 5 new 80 MVA transformers.
Within the framework of this project, the Consultant is in charge of the following activities:
- Carrying out detailed designs and environmental and social impact assessments (ESIA);
- Preparation of Resettlement Action Plans (RAP) in accordance with the Resettlement Policy Framework (RPF);
- Economic and financial analysis and assistance to MCA - Senegal II in defining the monitoring and evaluation framework;
- Preparation of tender documents (including environmental, social and health and safety clauses) for the construction works and implementation of the RAP;
- Assistance in the procurement and hiring of contractors;
- Construction supervision.

Lire plus Réduire

Project management assistance for the extension, reinforcement and densification of the distribution networks of component 2 of NELACEP (
2021
-
2024
)

Energy infrastructure Niger
World Bank

The general objective of the Niger Electricity Access project (NELACEP) is to increase access to electricity for households in order to contribute to the improvement of living conditions of populations in urban and rural areas. Component 2 of this project involves the extension and reinforcement of the distribution networks (medium and low voltage) in Niamey, in the chief towns of Niger's regions and electrification in rural areas.
Within the framework of this project, SOFRECO is carrying out the Project Management Assistance on behalf of the NIGELEC company.

Lire plus Réduire

Project management for the construction of the power line connecting the 30-MWp solar photovoltaic power plant in Ouagadougou (
2021
-
2022
)

Energy infrastructure Burkina Faso
Others

The overall objective of the project financed by GreenYellow is to build and commission a 30-MWp solar power plant, located approximately 30 km north-east of Ouagadougou, together with its 33-kV evacuation line, all connected to one of the existing 33/90-kV delivery substations in Ziniaré owned by Sonabel.
SOFRECO is responsible for supervising work on the 33-kV connection line and for commissioning the solar power plant and line.

Lire plus Réduire

Development of a National Master Plan for Electricity Generation, Transmission and Distribution (
2021
-
2022
)

Energy infrastructure Central African Republic
World Bank

Within the framework of the Water and Electricity Services Improvement Project (Projet d’Amélioration des Services d’Eau et d’Electricité - PASEEL) financed by the World Bank, the main objective of this mission is to draw up a plan for the optimised development of the means of power generation, transmission and distribution of electrical energy in the Central African Republic over a period of 20 years (2020-2040) in order to meet the energy and power demands of the population and the national economy and to facilitate the integration of renewable energies.
SOFRECO carried out three master plans for power generation, transmission and distribution and also developed ESIA screening, a Geographic Information System (GIS), a financial and economic analysis, a modelling and an investment plan; static and dynamic simulations of the electrical system as well as a study of the tariff implications of the master plans.

Lire plus Réduire

Consulting services for design, review of tender documents, project management and supervision for Masaka-Mbarara 400 kV transmission line and associated substations (
2020
-
2023
)

Energy infrastructure Uganda
French Development Agency

This project, jointly financed by the AFD and the KfW, aims at supporting the Uganda Electricity Transmission Company Ltd. (the Client) for the implementation of the Masaka-Mbarara 400 kV transmission line and associated substations.
It consists of two consecutive phases:
- Phase 1 involving the review, updating and additional study of the design documents, the preparation of the tender documents and support to the Client during the tendering process to select a contractor for the works (10 months).
- Phase 2 involving project management and construction supervision (18 months).

Lire plus Réduire

Assistance on project management for the integration of renewable energy (SENELEC) (
2020
-
2025
)

Energy infrastructure Senegal
French Development Agency

SOFRECO is providing technical assistance to Senelec on the “Project for the strengthening and modernisation of the Senelec network for the integration of renewable energy” financed by the AFD and the EU. This technical assistance consists of support on the entire programme, on procurement and on the coordination, supervision and management of contracts. These contracts for services and works relate to the programme’s three components: generation (battery storage systems), networks (transmission and distribution) and smart grids.

Lire plus Réduire

FIDIC engineer for the supervision of high- and medium-voltage works and for contract management (
2020
-
2023
)

Energy infrastructure Benin
Millennium Challenge Corporation

The works supervised by SOFRECO are part of the Distribution Project of the MCA-Benin Compact II financed by the Millennium Challenge Corporation. Its purpose is to strengthen the distribution networks of Benin’s electricity utility, Société béninoise d'énergie électrique (SBEE). SOFRECO is in charge of lot B which includes design and construction to strengthen and rehabilitate the current electricity distribution network in Cotonou and Porto Novo (substations and power lines).

Lire plus Réduire

Zagtouli photovoltaic plant, phase 2 (17 MWc) – Technical assistance and support with procurement (
2019
-
2022
)

Energy infrastructure Burkina Faso
Others

The overall objective of the second phase of the project to build the Zagtouli 17 MWc photovoltaic solar plant is to help develop the generation of cost-effective renewable electricity in Burkina Faso. This project is taking place under an EPC (engineering, procurement and construction) turnkey contract, and will bring the capacity of the Zagtouli plant to 50 MWc.
In the framework of this contract, SOFRECO is providing technical assistance and procurement support to the project promoter, SONABEL, Burkina Faso’s national electricity company, from the review of the studies through to the contractual arrangements with the Constructor.

Lire plus Réduire