Projects and references
1156 references correspond to your search
Capacity Building and Institutional Support for the Programme to Support the Development of Balanced Cities (PADEVE) - Fixed Phase and Conditional Phase ( 2017 - 2022 )
The Government of the Republic of Madagascar requested financial support from the French Development Agency for the implementation of the Programme to support the development of balanced cities (PADEVE).
PADEVE mainly aims to improve the living conditions of the populations of the communes of Antsiranana (Diégo Suarez), Fianarantsoa, Toliara (Tuléar), Antsirabe, Toamasina and Mahajanga in Madagascar, by creating an environment with infrastructures and urban services conducive to economic development and to strengthening the technical and financial capacity of decentralised authorities to efficiently management urban services and invest in public equipment.
The objective is to propose an integrated approach aiming to building the communes’ capacities in a sustainable and structural manner, by creating long-term capacity and supporting the planned investments.
Technical assistance to support the implementation of EU cooperation programmes in Tunisia ( 2023 - 2028 )
The aim of the Technical Cooperation Facility (TCF) is to increase the effectiveness of the EU Delegation and its partners in implementing current and future EU cooperation programmes in Tunisia.
The specific objectives of this contract are as follows: (i) Strengthen the various phases of the cooperation project cycle (including the formulation, identification, implementation and monitoring of programmes and projects), (ii) Strengthen political dialogue (and sectoral political dialogue) between the EU and Tunisia, (iii) Strengthen the capacity of line ministries and other stakeholders to implement and monitor programmes, and (iv) Facilitate the coordination and visibility of the Team Europe Initiatives (TEI) and other joint initiatives.
Development of a restructuring strategy for precarious neighbourhoods in Greater Tana ( 2022 - 2023 )
The main objective of this 6-month mission was to devise a development strategy for the restructuring of precarious neighbourhoods in Greater Tana within the framework of PRODUIR, carried out in a participatory and inclusive manner with all the actors involved in urban development in Greater Tana. It aimed at guiding and directing the Communes of Greater Tana and the Ministry of Decentralisation and Land Planning in future actions in these neighbourhoods.
This strategy was based on the results of the urban and social study carried out under the PRODUIR programme.
The study consisted of four stages: (1) defining the urban and socio-economic framework of the precarious neighbourhoods of Greater Tana, (2) SWOT analysis of the various actions carried out in the precarious neighbourhoods and international benchmarking, (3) development of the various aspects of the strategy at different scales, and (4) programming the implementation of the strategy in the short and medium terms for Greater Tana.
Technical assistance for the Programme of Adaptation of Cities to Climate Change (PAVICC) ( 2021 - 2023 )
The project aims to support the coordination unit of the Programme of Adaptation of Cities to Climate Change (PAVICC). This programme of nearly €50m supports four major cities in Benin on climate resilience via infrastructure and on local taxation via the recruitment of four tax experts housed directly in the cities to help the local administration improve its resource mobilisation.
Consultancy services for implementation support and capacity building to the project coordination unit (PCU) in PO-RALG under DMDP ( 2017 - 2022 )
The overall objective of the Consultancy services is to; (i) provide technical support and quality assurance to PO-RALG’s PCU and the respective MC PIUs and supervision consultants and contractors they to engaged by each MC to implement sub-projects); (ii) assist and advise the PCU in overall project monitoring and reporting utilizing, where necessary, the monitoring and reporting carried out by the respective PIUs and their support consultants; (iii) assist and advise the PCU in drafting Terms of Reference of key Component 3 studies including metropolitan governance; local government revenue collection and GIS; integrated transport and land use planning (in concert with DART and other key agencies/stakeholders as necessary), and; other urban studies and including Component 4 Feasibility Studies.
Railway Electrification Project Corridor 2 (Bukhara-Miskin-Urgench-Khiva) ( 2023 - 2027 )
The project aims to electrify the existing railway line between Bukhara, Miskin, Urgench, and Khiva, enabling high-speed passenger trains to operate and significantly reducing travel time from 8 hours (on road transport) to 3. The objective is to connect key tourist destinations like Tashkent, Samarkand, Bukhara, and Khiva by high-speed rail, boosting Uzbekistan's appeal as a tourism destination. Outputs include: 1) upgrading railway infrastructure along the line, and 2) developing the tourism corridor from Bukhara to Khiva.
Feasibility Study for 100–200 MW Wind Farm in West Java ( 2022 - 2026 )
As part of the diversification of Indonesia's energy mix, PLN wishes to develop a wind farm with an installed capacity of around 200 MW in the Banten region on the island of Java. SOFRECO is carrying out the feasibility study for this wind farm under AFD financing and in consortium with the developer 3E, until the recruitment of the turnkey contractor. This study begins with the installation of measurement masts, then includes the selection of the most suitable power generation devices for the site, the design of the wind farm and its connection, as well as all the technical and financial studies necessary for the construction (topography, geotechnics, transport and stability of the network).
Feasibility Study for the Hybridisation of the Power Plant in the City of Diffa ( 2022 - 2023 )
Conduct of a technical, economic, financial and environmental feasibility study for the hybridisation of the NIGELEC thermal power plant in Diffa, Niger, with photovoltaic solar energy, as well as its integration into the national grid.
Feasibility study for the second electricity interconnection project for Côte d'Ivoire/Burkina Faso ( 2022 - 2023 )
Conduct of a feasibility study on:
- the construction of a second high-voltage connection from Ferkessédougou or a neighbouring location on the Ivorian network (Kong) to Bobo Dioulasso (204 km) and from Bobo Dioulasso to Ouagadougou (336 km);
- the extension and/or construction of substations;
- electrification of communities and villages along the line and around the substations;
- the installation of compensation and synchronisation equipment and flow control, if required;
- CI-ÉNERGIES (Côte d'Ivoire) and SONABEL (Burkina Faso) network reinforcements, if required.
Feasibility study for the second electricity interconnection project for Côte d'Ivoire/Burkina Faso ( 2022 - 2023 )
Conduct of a feasibility study on:
- the construction of a second high-voltage connection from Ferkessédougou or a neighbouring location on the Ivorian network (Kong) to Bobo Dioulasso (204 km) and from Bobo Dioulasso to Ouagadougou (336 km);
- the extension and/or construction of substations;
- electrification of communities and villages along the line and around the substations;
- the installation of compensation and synchronisation equipment and flow control, if required;
- CI-ÉNERGIES (Côte d'Ivoire) and SONABEL (Burkina Faso) network reinforcements, if required.
Non-exaustive list. Please contact us for more information.