Projects and references
1176 references correspond to your search
Capacity building in the protection of intellectual property rights ( 2007 - 2009 )
The objective of the project is to improve the industrial and intellectual property framework in BiH to meet the “TRIPS-plus” requirements, which will contribute to fulfilling WTO and Stabilisation and Association Agreement conditions as well as those of CEFTA 2006. The project supports the development of the BiH IP Institute’s institutional capacity so that it can ensure the conduct of all its necessary functions, the strengthening of the industrial and intellectual property legal framework in conformity with TRIPS-plus, and the application of legislation on intellectual and industrial property.
Revamping of the sulfuric acid plant (2X1800 t/d) and related facilities in Jordan Phosphates Mines Co Limited JPMC Fertiliser Complex. ( 1994 - 1995 )
Technical assistance in analysing the proposals and writing the contracts for the revamping of the sulphuric units in Aqaba. Supervision of the engineering studies on the rehabilitation works and the start-up. Study of the environmental aspects (SO2).
Institutional and regulatory study of the oil and gas sectors. ( 2002 - 2003 )
Development of the institutional arrangements necessary to the transformation of the Petroleum Division into a Statutory Agency of the Government, an organisation of excellence responsible for the management, regulation and monitoring of the petroleum industry in PNG.
Security of supply of gas to Armenia within the framework of the closure of the Medzamor nuclear power plant. ( 2002 - 2004 )
Technical assistance in rehabilitating and modernising the gas transport infrastructure used for importing gas from the Russian Federation via Georgia and in reducing the risk of supply disruptions.
Diversifying Eswatini's sugar industry through the development of an agri-business park ( 2021 - 2021 )
The objective of the study is to develop a conceptual proposal for an agribusiness park, to be situated close to the sugar mills for industries that use sugarcane related by-products as well as businesses involved in the supply of inputs and services to the sugar industry. This encompasses a proposed location, a detailed review of the relevant legislation, the incentives to put in place and the required infrastructures. The consultant is expected to prepare a detailed conceptual proposal with implementation timelines, clearly outlining actions to be taken by the sugar industry and those to be undertaken by Government.
Decentralisation of Chemotherapy and Radiotherapy Services within Hospital Health Care ( 2012 - 2013 )
Development of a detailed action plan for the decentralisation of radiotherapy and chemotherapy services within hospital health care:
(i) Detailed plans for the modernisation of hospital capacity
(ii) A comprehensive plan for staff training
(iii) Identification of opportunities for public-private partnership
(iv) Estimates of the costs for the infrastructure needed to modernise the hospitals in Balti and Cahul.
Preparation of a Technical Assistance and/or Institutional Twinning Project Fiche for the National Hygiene Institute in Morocco ( 2006 - 2007 )
Support to and promotion of the Moroccan Ministry of Health’s (MoH) institutional and hospital reform project; contribution to strengthening health monitoring and safety; establishment of a national accreditation programme for MoH public health laboratories within the framework of the quality assurance national plan; and promotion of the development project for technical and scientific research within the health system.
Commercial viability study of a vehicle scrapyard ( 2021 - 2021 )
The Support Project for the Competitiveness of Logistics Services for Trade ($18 million) provides for the renewal of the road transport vehicle fleet in particular, enabling passenger and goods road transport companies to renew their fleets and become more competitive.
Under this component of the project aimed at setting up a system for treating and recycling vehicles that are too old and that will be taken off the road, the study aims to assess the technical and commercial feasibility of a vehicle scrapyard meeting environmental and social standards, integrating both the organisational and financial dimensions of the value chain (governance, economic model, etc.) and the technical and operational dimensions (site, process description and layouts, guide drawings of the facilities and infrastructures). It covers the vehicles that will be removed from the vehicle fleet as part of the renewal programme, as well as any other vehicles destined for scrapping according to criteria to be defined with the competent authorities.
Support for the implementation of the Partnership and Co-operation Agreement (PCA) between the EU and Azerbaijan Phase III ( 2006 - 2008 )
Support for the implementation of the Partnership and Co-operation Agreement (PCA) between the EU and Azerbaijan, Phase III. Technical assistance for the PCA’s implementation: building capacity within the administration to identify priority sectors for the implementation of the trade, economic and commercial provisions of the PCA; assisting with legislative and administrative reforms and with approximation with EU legislation in the PCA fields; and assisting with accession to the WTO.
Carbon finance development for flare reduction projects ( 2005 - 2006 )
Enhancement of project developers' and national authorities’ access to the full range of technical, policy and greenhouse gas market information required to advance a project, and development of a solid policy framework enabling carbon crediting projects to move ahead.
Non-exaustive list. Please contact us for more information.