Consultancy services for the Extension and Restructuring of Electricity Distribution Networks ( 2016 - 2022 )
The objective of this consultancy project was to ensure the proper performance of the works in accordance with the contractual specifications and requirements in terms of quality, schedule and costs, as well as the efficient commissioning of the project for the two following components: Lot A, covering the restructuring and extension of the electricity distribution networks of nine cities in Senegal, and Lot B, covering the procurement and installation of pre-paid meters and smart meters. The Consultant acted as the Contracting Authority’s representative during the execution of the contracts to be carried out on the latter’s behalf by the constructors and suppliers. Under the authority of the Project Coordinator, the Consultant worked with the project implementation unit in the spirit of teamwork and broad consultation.
Supervision of works to connect isolated secondary centres to the national power grid ( 2015 - 2017 )
Supervision of the works carried out by SONABEL (Burkina Faso's national power utility) under three simultaneous contracts:
- Contract 1: Construction of the 90 kV Ouagadougou - Ouahigouya power line
- Contract 2: Construction of a 90/33/20 kV substation in Ouahigouya and extension of the 225/90/33 kV Ouagadougou substation
- Contract 3: Construction of the 33 kV Kongoussi - Djibo power line, extension of the distribution grids in Djibo and electrification of Ouahigouya, Gourcy, Yako, Bourzanga and Namsiguia, construction of the 33 kV Kaya - Dori power line, extension of the distribution grids of Dori, and electrification of Pissila Tougouri, Yalgo and Bani.
Project for the supervision of the extension works on the Bobo II power plant ( 2013 - 2015 )
Within the framework of the project for the supervision of the extension works on the Bobo II thermal power plant, SOFRECO is verifying the construction plans, controlling the works and carrying out the approval of the acceptance tests for the different structures to be built under this project (additional 2x10 MW, HFO/DDO fuel), located near Bobo-Dioulasso, Burkina's second largest city.
Technical Assistance to Regional Capacity Development for Strengthening Resilience to Climate Change in the Health Sector in the Greater Mekong Subregion (formerly Mitigating Human Impact of Climate Change) ( 2016 - 2020 )
The TA aims to deliver three outputs in the GMS: (i) knowledge and understanding of the relationship between climate change and human health improved; (ii) human resource skills in coping with climate change adaptation in the health sector strengthened; (iii) knowledge products shared and advocacy promoted.
Development of a communication strategy and tools for the promotion of medical tourism ( 2018 - 2021 )
This project aims to develop an effective relational and digital communication strategy to fill the current gap. This strategy will deepen the link and relationship with international patients and foster a relationship based on psychological proximity.
Outsourcing Outpatient Drug Benefit Scheme ( 2018 - 2019 )
The OPDBS project is part of the first component of the Kosovo Health Project (KHP) aimed at strengthening the capacity of the Ministry of Health (MoH) and the Health Insurance Fund (HIF) to implement mandatory health insurance and to improve the quality and efficiency of health services, as part of the reform of the mandatory health insurance in Kosovo.
The main objectives of the project Outsourcing Outpatient Drug Benefit Scheme is to provide the MoH and HIF with the technical assistance to efficiently establish, sustain and implement the Kosovo outpatient drug benefit scheme, in order to ensure access to quality and affordable medicines to the entire population of Kosovo and thus decrease the out-of-pocket spending related to the purchase of medicines in the country.
Technical Assistance to Regional Capacity Development for Strengthening Resilience to Climate Change in the Health Sector in the Greater Mekong Subregion (formerly Mitigating Human Impact of Climate Change) ( 2016 - 2020 )
The TA aims to deliver three outputs in the GMS: (i) knowledge and understanding of the relationship between climate change and human health improved; (ii) human resource skills in coping with climate change adaptation in the health sector strengthened; (iii) knowledge products shared and advocacy promoted.
Technical Assistance to Regional Capacity Development for Strengthening Resilience to Climate Change in the Health Sector in the Greater Mekong Subregion (formerly Mitigating Human Impact of Climate Change) ( 2016 - 2020 )
The TA aims to deliver three outputs in the GMS: (i) knowledge and understanding of the relationship between climate change and human health improved; (ii) human resource skills in coping with climate change adaptation in the health sector strengthened; (iii) knowledge products shared and advocacy promoted.
Development and implementation of a health information and decision-making system, integrating health watch, planning and management of health services (including human resources) and electronic file components ( 2013 - 2014 )
Under this contract, the Ministry plans to computerise part of this system, mainly concerning the electronic medical file (EMF). Once it has been introduced, the EMF, as well as being a source of strategic, privileged information for the decision-making and health information system, will be used as an operational tool with advanced features, designed to improve the quality of care and operational management of hospital services. It should contribute to improving management tools by making information accessible to health managers and professionals, at operational as much as strategic level.
Mid-term evaluation of the use of telemedicine and distance learning tools at Shastin Hospital’s Cardiovascular Diseases Diagnostic Centre ( 2009 - 2009 )
The main focus of this support has been on transferring know-how to provincial hospitals in order to contribute to the prevention of cardiovascular diseases and their early detection and treatment.
This mid term evaluation was carried out in order to assess the deployment of telemedicine and long distance education tools to achieve those goals.
Non-exaustive list. Please contact us for more information.