Skip to main content

1156 references correspond to your search

Project for the supervision of the extension works on the Bobo II power plant (
2013
-
2015
)

Energy infrastructure Burkina Faso
Others

Within the framework of the project for the supervision of the extension works on the Bobo II thermal power plant, SOFRECO is verifying the construction plans, controlling the works and carrying out the approval of the acceptance tests for the different structures to be built under this project (additional 2x10 MW, HFO/DDO fuel), located near Bobo-Dioulasso, Burkina's second largest city.

Lire plus Réduire

Supervision of works to connect isolated secondary centres to the national power grid (
2015
-
2017
)

Energy infrastructure Burkina Faso
French Development Agency

Supervision of the works carried out by SONABEL (Burkina Faso's national power utility) under three simultaneous contracts:
- Contract 1: Construction of the 90 kV Ouagadougou - Ouahigouya power line
- Contract 2: Construction of a 90/33/20 kV substation in Ouahigouya and extension of the 225/90/33 kV Ouagadougou substation
- Contract 3: Construction of the 33 kV Kongoussi - Djibo power line, extension of the distribution grids in Djibo and electrification of Ouahigouya, Gourcy, Yako, Bourzanga and Namsiguia, construction of the 33 kV Kaya - Dori power line, extension of the distribution grids of Dori, and electrification of Pissila Tougouri, Yalgo and Bani.

Lire plus Réduire

Consultancy services for the Extension and Restructuring of Electricity Distribution Networks (
2016
-
2022
)

Energy infrastructure Senegal
Others

The objective of this consultancy project was to ensure the proper performance of the works in accordance with the contractual specifications and requirements in terms of quality, schedule and costs, as well as the efficient commissioning of the project for the two following components: Lot A, covering the restructuring and extension of the electricity distribution networks of nine cities in Senegal, and Lot B, covering the procurement and installation of pre-paid meters and smart meters. The Consultant acted as the Contracting Authority’s representative during the execution of the contracts to be carried out on the latter’s behalf by the constructors and suppliers. Under the authority of the Project Coordinator, the Consultant worked with the project implementation unit in the spirit of teamwork and broad consultation.

Lire plus Réduire

Evaluation of the French Medical Cooperation in China from 1997 to 2002. (
2002
-
2002
)

Social sector China
French Ministry of Foreign Affairs

Evaluated the various projects supported by the French cooperation in the medical field: training of medical doctors, support to HIV/AIDS control programme, support to health insurance schemes.

Mid-term review of the project to fight AIDS, malaria and tuberculosis (
2006
-
2007
)

Social sector Djibouti
World Bank

The Grant Agreement between the IDA and the Republic of Djibouti setting out the modalities for the implementation of the project to fight AIDS, malaria and tuberculosis, planned a mid-term evaluation 30 months after the beginning of the project. The Consultant was in charge of evaluating the HIV/AIDS section. 

Technical Assistance to the Ministry of Health (Project Number 9 ACP BAR 004), Health Sector Programme (
2005
-
2008
)

Social sector Barbados
European Union

Development and implementation of a comprehensive and integrated health strategy under a sector wide approach focusing on pro-poor policies and fair financing for the poor with emphasis on health systems development, information systems and home and community based care. Institutional strengthening and capacity building in the context of health sector reform. Improvement of health care delivery for all levels of the health system (hospital, polyclinics and ambulatory care) with focus on community and home based care development.

Lire plus Réduire

Identification and formulation of a project targeting the fight against poverty (
2004
-
2004
)

Social sector Paraguay
European Union

Identification of a social development project in Paraguay targeting the fight against poverty, design of the components and methodology of the formulated project and elaboration of an identification sheet and a financing proposal, together with a detailed description and recommendations for the project’s implementation.

Feasibility study for the development of a 1,000 MW wind farm near Marsabit in Kenya (
2020
-
2023
)

Energy infrastructure Kenya
French Development Agency

As part of its renewable energy expansion strategy, KenGen has identified a site with a 1,000 MW wind power potential to develop a new wind farm. The objective of the assignment is to assess the feasibility of wind power development at the proposed site, estimate the optimal capacity to be developed without requiring major grid reinforcement, and then prepare conceptual designs and conduct a preliminary environmental and social impact assessment (ESIA)/scoping study on the site, including a rapid bird and bat assessment. The study also involves the preparation of the project implementation plan, the procurement procedure and the operation strategies.

Lire plus Réduire

Feasibility study and environmental and social impact assessments of the FORSUN project: 20 MW photovoltaic solar power plant and strengthening of the distribution network in Benin (
2020
-
2021
)

Energy infrastructure Benin
French Development Agency

The aim of this Technical Assistance mission is to strengthen the electricity sector in Benin as well as to foster the development of renewable energies via three main components. The first consists of the production of a preliminary design, detailed preliminary design, and detailed Environmental and Social Impact Assessment (ESIA), as well as the drafting of bidding documents for the extension, densification and strengthening of the LV and MV grid in urban and rural areas. The second aims to increase the share of solar power in the electricity through the production of a preliminary design, detailed preliminary design and ESIA, as well as drafting of bidding documents of the DEFISSOL solar power plant extension (+20 MW). The third and final component consists of the drafting of two generic documents intended for use on all the electrification projects of the Beninese Electricity Company (SBEE): an Environmental and Social Management Framework (ESMF) as well as a Resettlement Plan Framework.

Lire plus Réduire

Technical support for the design and implementation of the Health Human Resource Development Support Project (PADRHS) (
2014
-
2017
)

Personnel de santé Congo
French Development Agency

Objectives:
- To support stakeholders in the design and implementation of a new governance system for paramedical education;
- To support stakeholders in the design and implementation of an educational and organisational reform at the level of paramedical schools.

Non-exaustive list. Please contact us for more information.