Projects and references
1175 references correspond to your search
Development of master plans for general reference hospitals (GRH) - phase 2 ( 2018 - 2018 )
The methodology included four phases:
- Definition of the strategy and regional orientations (updating of phase 1);
- Situation analysis of three general reference hospitals (GRHs) and definition of the future needs of six GRHs;
- Strategic options;
- Development of master plans for six GRHs.
Development of a phase 1 business plan for a newly constructed district hospital in the City of Kigali ( 2018 - 2019 )
The objective was to perform a situational analysis of the future District Hospital of Nyarugenge in Kigali, in order to develop the business plan: analysis of the general context, stakeholders, legal framework and regulations, specific needs, available resources, etc.
- Market study
- SWOT analysis (strengths, weaknesses, opportunities, threats)
- Organisational structure and human resource requirements
- Financial plan (income and charges)
- Preparation of an implementation master plan
- Terms of reference for the implementation of phase 2 of the business plan.
Transformation of the master plans of the general reference hospitals of South Ubangi, Kwilu and Tshopo - phase 3 ( 2018 - 2019 )
Master plans for nine general reference hospitals (GRHs) of South Ubangi, Kwilu and Tshopo were prepared in phases 1 and 2. On this basis, the teams of nine general reference hospitals (GRHs) decided which infrastructure should be financed in priority under Enabel’s Programme in support of provincial health divisions (PADP).
A pool of health infrastructure experts composed of international technical assistants and local engineers was therefore set up to support the actions for the preparation of the technical specifications, works supervision and monitoring of the public procurement.
The services concerned the following infrastructure:
- for the province of South Ubangi: the operating theatre of the maternity of the GRH of Tandala, the emergency and medical imaging unit of the GRH of Bwamanda, and the medical imaging ward of the GRH of Gemena;
- for the province of Kwilu: the operating theatre, the laboratory and the sterilisation room of the GRH of Mokala;
- for the province of Thopo: the maternity ward of the GRH of Makisso-Kisangani, the medical imaging unit and the laboratory of the GRH of Lubunga, and the medical imaging unit and the admissions office of the GRH of Kabondo.
Development of scenarios for the reform of Morocco's national social protection system ( 2018 - 2018 )
The objective of this assignment is focused on translating the various components of the integrated vision of social protection into reform scenarios that can strengthen and improve the performance of the national social protection system in favour of vulnerable populations, with an operational action plan in the short/medium terms for their implementation.
Design of the social protection system (SPS) in Paraguay ( 2018 - 2019 )
Technical assistance to the Government of Paraguay for the design of the social protection system in its institutional, legal, planning, budgetary and operational aspects, in line with the strategic objectives.
Assistance for the development of a proposal for the gradual implementation of the social protection system over the 2018-2023 period.
Diagnosis of health infrastructures ( 2018 - 2018 )
This assignment for the diagnosis of health infrastructures was part of the implementation of the Health Sector Support Programme (PASS) in Mauritania financed by the European Union under the 11th EDF. The main objective of the mission was to draw up an inventory of the Ministry of Health’s public health facility priorities in the wilayas of Brakhna and Trarza and in the city of Nouakchott, and to determine the needs in terms of rehabilitation, extension or complete construction taking account of electrification (solar, etc.) and water requirements, and the integration of gender- and environment-related components.
The secondary objective was to provide support on the updating, improvement and standardisation of the building standards of basic health facilities to Mauritania’s Ministry of Health.
Commercial viability study of a vehicle scrapyard ( 2021 - 2021 )
The Support Project for the Competitiveness of Logistics Services for Trade ($18 million) provides for the renewal of the road transport vehicle fleet in particular, enabling passenger and goods road transport companies to renew their fleets and become more competitive.
Under this component of the project aimed at setting up a system for treating and recycling vehicles that are too old and that will be taken off the road, the study aims to assess the technical and commercial feasibility of a vehicle scrapyard meeting environmental and social standards, integrating both the organisational and financial dimensions of the value chain (governance, economic model, etc.) and the technical and operational dimensions (site, process description and layouts, guide drawings of the facilities and infrastructures). It covers the vehicles that will be removed from the vehicle fleet as part of the renewal programme, as well as any other vehicles destined for scrapping according to criteria to be defined with the competent authorities.
Diversifying Eswatini's sugar industry through the development of an agri-business park ( 2021 - 2021 )
The objective of the study is to develop a conceptual proposal for an agribusiness park, to be situated close to the sugar mills for industries that use sugarcane related by-products as well as businesses involved in the supply of inputs and services to the sugar industry. This encompasses a proposed location, a detailed review of the relevant legislation, the incentives to put in place and the required infrastructures. The consultant is expected to prepare a detailed conceptual proposal with implementation timelines, clearly outlining actions to be taken by the sugar industry and those to be undertaken by Government.
Regulatory Assessment of the Azerbaijan Horticulture Value Chain ( 2020 - 2020 )
Establishment of a list that is as exhaustive as possible of the documents necessary for production, marketing and processing in the horticultural value chain (fruits and vegetables) based on an analysis of the legislation and discussions with stakeholders in businesses and administration.
Cambodian Rubber International Certificate Issuance and Commercialization Support ( 2005 - 2009 )
The main objective of this project is to increase income for all stakeholders in the Cambodian rubber commodity chain. It aims: (1) to reorganize the commodity chain to achieve better commercial equity between the different stakeholders; (2) to secure additional currency earnings for the country in order to rectify an estimated loss of 8 million dollars per year due to discounting of Cambodian natural rubber on the international market; (3) to ensure higher employment in the sector on both smallholdings and estates.
Non-exaustive list. Please contact us for more information.