Projects and references
1176 references correspond to your search
Mineral resource reporting audit (JORC compliance) ( 2019 - 2019 )
Analysis of the exploration method and mineral resource estimation for nickel ore in lateritic deposits.
Audit of methods and procedures for mineral resource estimate including the benchmarking with JORC standard.
Identification of areas for improvement and preparation of recommendations.
Audit and JORC certification of nickel mineral resources in one mining license.
Al Jalamid exploration programme ( 2019 - 2019 )
The project aims to upgrade the resources in the Al Jalamid exploration license area n°1 to measured resources compliant with the JORC Code.
Mineral resource estimation of the Umm Wu’al phosphate projects ( 2018 - 2019 )
Update of the global resource estimate (JORC compliant) of the Umm Wu'al exploration license:
- QA/QC analysis.
- Statistical and geostatistical analysis of the drilling data.
- Geological modelling
- Resource estimate.
Pre-feasibility study for the Phase1 PHOS 3 project: Geology and Mining ( 2018 - 2018 )
The objective of the project is to prepare the geology and mining studies for the Al Jalamid mine expansion within the PHOS-3 project:
* Resource modelling and classification, COG specification,
* Resources at least at the indicated level,
* Reserves at the probable level,
* Conceptual mine development,
* +/- 20% cost estimate for the mine and associated infrastructure.
Moroccan mining industry health and safety improvement programme ( 2018 - 2021 )
The Moroccan mining industry is facing some serious health and safety issues. The number of work-related accidents and occupational diseases that are becoming more and more serious seems to be growing compared to other industrial sectors.
Aware of this situation, the EBRD has launched a request for proposals aiming to select a consultant who will be in charge of conducting a study to analyse the health and safety issues of the Moroccan mining industry. This study includes a legal and practical analysis of the situation and puts forward some recommendations to strengthen the capacity of operators and administration in order to align health and safety management in Moroccan mines with the best international practices.
Technical support for phosphate project development ( 2018 - 2020 )
The objective of this assignment was to provide technical and management support to Ma'aden Phosphate in the development of phosphate projects through three sets of actions:
1. Technical support to the SBU team;
2. Office support;
3. Field support.
Life of mine update ( 2018 - 2018 )
The objective of this work was to define the best cut-off grade strategy and optimal pit limit for the Goro project (Vale New Caledonia). Vale New Caledonia is an ore mining company (limonite and saprolite) producing nickel and cobalt. The work included the following activities: update of the mine design criteria, pit optimisation and scenario analysis, mine design and mine production schedule and infrastructure design.
Mineral Resource Estimation for Yaou & Dorlin / Scoping Study ( 2018 - 2018 )
The objectives of phase 1 were to collect the data/documents in Auplata’s possession that were relevant to carry out the geological and mining studies, and more generally, the studies needed to develop the deposits of Yaou, Dorlin, Dieu Merci, Couriège, Bon Espoir and Iracoubo Sud, and to create a documentary database integrating these data/ documents.
The objective of the second phase was to define the optimal methodology to obtain the resources indicated for Auplata’s deposits (Yaou, Dorlin, Dieu Merci, Couriège, Bon Espoir and Iracoubo Sud). Here ‘optimal methodology’ means a methodology maximising the chances of achieving the objective, i.e. obtaining the resources indicated, in a cost-effective manner.
Phosphate-3 Project Complimentary Fieldwork ( 2018 - 2019 )
Design, supervision and studies for the complementary works of the PHOS-3 project:
- One Trial Mining Cut (TMC) for the characterisation of the UMW4-5 deposit, including drill and blast, digging tests, equipment performance, bulk sampling (app. 60 t of ore), transportation for crushing and milling tests, in-situ bulk density, moisture content and Point Load Test (PLT - optional) as well as geological logging and sampling.
- Reverse Circulation (RC) drilling as part of grade control.
Gara Djebilet iron ore deposit – Review of the JORC resource estimate ( 2018 - 2018 )
This contract dealt with the review of the resource estimate of the Gara Djebilet iron ore deposit. The resource estimate was prepared for FERAAL by the company DMT (the project’s PMC).
Non-exaustive list. Please contact us for more information.